Allow around £900 to buy and install a 7 kW home EV charger, although typical installed costs range from £500 to £1,200 depending on the charger and your property. For 2026/27, government grants cover 75% of eligible costs up to £500 per socket, but only for renters, flat owners, households with on-street parking and residential landlords. Owner-occupiers of houses with a private driveway are not eligible for the main UK grant.

What a home charger costs

Prices vary with the charger, the installer and the work your home needs. These figures are price guides rather than quotes.

Price guideFigure
7 kW charger, bought and installed (Which?, February 2026 estimate)Around £900
Typical installed cost across different charger outputs£500 to £1,200
Advertised starting prices for smart chargers with standard installation from Ohme, Pod and Octopus Energy (November 2026 price check)£949 to £1,269

What can push the price up

Check exactly what the installation quote includes. A longer cable run, groundwork or electrical upgrades can all add to the bill. If you are considering a 22 kW home charger, note that it requires a three-phase supply.

If you park on the street

Budget separately for a pavement channel to carry the cable. The UK on-street grant covers buying and fitting the chargepoint itself, and separate help with an embedded channel may be available through your local authority. A typical UK-wide installed price for pavement channels has not been confirmed, so ask for a written quote.

Grants for 2026/27

The Office for Zero Emission Vehicles (OZEV) raised the grant cap from £350 to £500 per socket on 1 April 2026. The three residential grants below cover 75% of eligible purchase and installation costs, up to that cap. Funding is confirmed until 31 March 2027. Whether a replacement scheme will follow from April 2027 has not been confirmed.

Renters and flat owners with off-street parking

You can apply for one socket if you rent and live in the property, or own and live in a flat. You also need a private, clearly defined off-street parking space and must meet the eligible vehicle rules. Get written permission from the landlord, freeholder or property manager where required.

Households with on-street parking

Owners and renters can apply for one socket if they live at the property, do not have exclusive private off-street parking, have suitable on-street parking and meet the eligible vehicle rules. A permanent cross-pavement solution and highways approval are required. Temporary cable mats and covers are not eligible.

Residential landlords

Eligible landlords with private off-street parking can apply for up to 200 sockets across their sites. The separate residential landlord infrastructure grant closed to new applications on 31 March 2026.

Homeowners with a driveway

An owner-occupier of a house with a private driveway falls outside the household categories in OZEV’s current offer. If that is you, plan on paying the full installed cost unless a local scheme applies.

How to claim the grant

Use an OZEV-authorised installer and an eligible chargepoint. The installer claims the grant and deducts it from your bill.

Tip

Apply before installation and wait for OZEV to confirm your eligibility before the charger is fitted. Do not let the installer book the work until that confirmation is in.

Extra support in Scotland

Transport Scotland funds a separate domestic charger grant of up to £400 for eligible rural and island households. Its cross-pavement scheme offers up to £3,500 in participating council areas, of which up to £400 can go towards an eligible home chargepoint installation. Check availability in your area before any work starts.

Do you need planning permission?

All four UK nations have permitted development rights for qualifying chargers, but the details differ.

  • England. Since 21 October 2026, qualifying home chargepoints and pavement-embedded cable channels can use permitted development rights. For a chargepoint using those rights, any cable crossing a footway must use an authorised cross-pavement solution, and the channel still needs highways authorisation. Installing a channel does not give your household priority over the parking space outside.
  • Scotland. Classes 9E and 9F provide permitted development rights for qualifying wall-mounted chargers and charging posts in eligible parking areas. General householder permitted development rights may also apply.
  • Wales. Classes D and E provide permitted development rights, subject to conditions, for wall-mounted outlets and charging posts in areas lawfully used for off-street parking.
  • Northern Ireland. Classes D and E provide permitted development rights, subject to conditions, for wall-mounted outlets and charging posts in areas lawfully used for off-street parking.

Electrical and network rules

Telling the network operator

In Great Britain, the Distribution Network Operator (DNO) needs to know about your charger. If the installation qualifies for connect and notify, the installer can fit the charger and notify the DNO within 28 days. If it falls under apply to connect, the DNO must approve it before installation.

Electrical safety and smart charging

In England, installing a new domestic circuit is notifiable under Part P of the building regulations. Private domestic chargepoints covered by Great Britain’s smart chargepoint regulations must support smart charging. Sales in Northern Ireland are outside the scope of those regulations. Once your charger is in, compare EV home charging tariffs to make the most of it.

Changes on the way

Several proposals could affect home charging, but none of them has become law yet.

  • Building regulations in England. Part S sets EV charging requirements for specified new buildings, changes of use and major renovations. A consultation opened on 21 October 2026 on changes, including provision in covered car parks and a review of the £3,600 installation cost cap.
  • Tenants and leaseholders. The government is consulting on clearer routes for tenants and leaseholders to request permission to install a charger at their building’s off-street parking space. Responses close on 16 December 2026. The consultation has not created a new right to install.
  • Installer registration. The Energy Independence Bill proposes a duty on installers to register chargepoint installations with DNOs. A start date has not been confirmed.

Weighing up home charging

A home charger is a significant upfront cost, so compare it with how you would charge otherwise. Our guide to charging an electric car in the UK covers the options, our breakdown of public charging costs helps you compare prices, and our electric cars guide brings together everything else you need to know about owning an EV.

Frequently asked questions

How much does it cost to install a home EV charger?

Which? suggests allowing around £900 to buy and install a 7 kW home charger, with typical installed costs across different outputs of £500 to £1,200. The final quote depends on your property and the installation, such as cable length, groundwork and any electrical upgrades.

Can I get a grant for a home EV charger?

For 2026/27, OZEV grants cover 75% of eligible purchase and installation costs, up to £500 per socket. They are open to renters and flat owners with off-street parking, households with on-street parking and residential landlords. Funding is confirmed until 31 March 2027.

Can homeowners with a driveway get the EV charger grant?

No. An owner-occupier of a house with a private driveway falls outside the household categories in OZEV's current offer. In Scotland, Transport Scotland funds a separate grant of up to £400 for eligible rural and island households.

Do I need planning permission for a home EV charger?

In England, since 21 October 2026, qualifying home chargepoints and pavement-embedded cable channels can use permitted development rights. Scotland, Wales and Northern Ireland also have permitted development rights for qualifying chargers, subject to conditions.

Can I run a charging cable across the pavement?

In England, for a chargepoint using permitted development rights, any cable crossing a footway must use an authorised cross-pavement solution, and the channel still needs highways authorisation. Temporary cable mats and covers are not eligible for the on-street grant.

Sources

PlateScout is independent and not affiliated with the DVLA, DVSA, TfL or any government body. Rules and rates change: always check the official source before you act.

Check a number plate now

See when and where a car was first registered, free and without signing up.

UK

Works for current, prefix and suffix plates.